They made a good bit of progress in the last two days. The rough-in of the forced-air ductwork is now complete. The electrical work is proceeding, and more and more Hardie Board is going up. In the picture below, you can see that the shed dormer now has windows and siding, and there is fascia board on its roof.
The men on the roof measure and pass information to the man below, who saws a plank to the right meassurements. Then he tosses it to the men above, who nail it in place, while the man below cuts the next piece. It actually goes rather quickly. Although there is still a good bit more trim to measure, cut, and install, the Decra roofing can be seen already on the ground in the lower left, waiting its turn to be installed.
All the best. --oc
No comments:
Post a Comment